SR 31 at CR 74 Roundabout

Location: Charlotte County, FL

Client: Florida Department of Transportation District 1

Size: 15 Acres, $6M

Delivery Method: Design Bid Build

Status: Design Phase

Bentley is working with FDOT D1 to provide engineering evaluation, design services, and construction plans preparation for the SR 31 at CR 74 intersection improvements in Charlotte County, FL. The project will reconstruct the signalized intersection of SR 31 and CR 74 into a single lane high-speed roundabout configuration. The resulting project is anticipated to provide significant safety improvements to traveling motorists as well as enhance capacity through the intersections. The project also includes an upgraded drainage system design, new LED lighting, and three stormwater ponds.