Prineville Maintenance Building

Location: Port St. Lucie, FL

Client: City of Port St. Lucie

Size: 67,650 SF, $6.69M

Delivery Method: Design Bid Build

Status: Designed and Constructed June 2018-December 2020

This project includes the construction of 23,475 SF of enclosed pre-engineered metal building maintenance facility and an attached 15,200 SF covered area with a 2,950 SF internal mezzanine. A 27,230 SF covered generator storage area is also be provided South of the Maintenance Building with parking for 70 generator trailers.

The Maintenance Building includes  department spaces for
Collections, Distribution, Electrical Group, Lift Station Group, Water Plant Maintenance Group, and Shared Shop Area w/ adjacent service rooms. In addition, the 27.8 acre site was re-developed to include a new parking area, pump wash-down pad, dumpster enclosure, re-surfaced driveways, sidewalks, medians, new perimeter concrete wall and all necessary site and building utilities and infrastructure.

A new and improved version of The Bentley Group website is on its way! Stay tuned for the launch later this summer.

X