Howard Frankland Bridge

Location: Tampa, FL

Client: Florida Department of Transportation District 7

Size: 6 Miles, $864,929,000

Delivery Method: Design-Build

Status: Under Construction

This Design-Build project is replacing one of the existing bridges over Old Tampa Bay to provide additional capacity between Hillsborough and Pinellas Counties. Bentley’s scope for the project includes the design and construction administration for the renovation of the existing FDOT RTMC, two toll sites and the aesthetics features. The aesthetic feature scope included developing renderings for public vote, designing the structures and foundations and coordination with all other design disciplines; the aesthetic features included four bridge overlooks, four primary locations and 36 secondary locations.

A new and improved version of The Bentley Group website is on its way! Stay tuned for the launch later this summer.

X