Crane's Roost Park Redesign

Location: Altamonte Springs, FL

Client: City of Altamonte Springs

Size: 45 Acres, $15M

Delivery Method: Construction Manager at Risk

Status: Designed and Constructed June 2016-August 2022

Cranes Roost Park features a lake encircled by one mile of continuous walkway with benches and covered seating. As part of a continuing contract, Bentley spearheaded the design for the reconstruction of the park.

Bentley’s scope included the reconstruction of Cranes Roost Boulevard with new roadway pavers featuring a custom design created by Bentley; reconstruction and widening of park sidewalks to accommodate additional pedestrian traffic; and installation of pavers throughout the Eddie Rose Amphitheater. Bentley also provided structural design for the complete replacement of one of the two boardwalks spanning the Cranes Roost Lake and partial replacement of the other. A floating stage was rehabilitated as part of the project to include a new green room and bathroom facilities within the floating stage. New water fountains and benches were installed throughout the park.

A new and improved version of The Bentley Group website is on its way! Stay tuned for the launch later this summer.

X