Crane's Roost Park Redesign
Location: Altamonte Springs, FL
Client: City of Altamonte Springs
Size: 45 Acres, $15M
Delivery Method: Construction Manager at Risk
Status: Designed and Constructed June 2016-August 2022
Cranes Roost Park features a lake encircled by one mile of continuous walkway with benches and covered seating. As part of a continuing contract, Bentley spearheaded the design for the reconstruction of the park.
Bentley’s scope included the reconstruction of Cranes Roost Boulevard with new roadway pavers featuring a custom design created by Bentley; reconstruction and widening of park sidewalks to accommodate additional pedestrian traffic; and installation of pavers throughout the Eddie Rose Amphitheater. Bentley also provided structural design for the complete replacement of one of the two boardwalks spanning the Cranes Roost Lake and partial replacement of the other. A floating stage was rehabilitated as part of the project to include a new green room and bathroom facilities within the floating stage. New water fountains and benches were installed throughout the park.