US 41 Widening from South of Pendola Point

Owner: Florida Department of Transportation District 7

Size: 1.4 miles

Delivery: Design Bid Build

Description: Bentley is working with FDOT D7 for the widening of US 41 from  a four-lane divided to six-lane divided arterial. Additional improvements include ADA enhancements, and upgraded drainage system design, new signalization, and lighting upgrades. Responsibilities include site investigation, data analysis, roadway design, flexible and rigid pavement design, ADA design, signing and pavement marking plans, Traffic Control Plans and Utility Coordination.